Albany, NY -- (SBWire) -- 02/08/2017 --The construction of a data center encompasses design, architecture, installation of electrical and mechanical systems, and general construction works. The demand for cloud-based services and the growth of the Internet of Things (IoT) are prompting enterprises in Southeast Asia to construct data centers to gain a competitive edge. Complexities associated with business applications have increased because of enormous growth in data volumes, triggering an increased need for the construction and renovation of data centers. In addition, enterprises are focusing on the building of green data center facilities to reduce power consumption and carbon dioxide emissions.
The data center construction market in Southeast Asia to grow at a CAGR of 14.8% during the period 2016-2020. The report covers the present scenario and the growth prospects of the data center construction market in Southeast Asia for 2015-2020. To calculate the market size, the report considers the revenue generated from the building of new data centers (including modular data center facilities) and the renovation of data centers.
The market is divided into the following segments based on electrical construction:
- UPS
- Energy storage equipment
- Generators
- Transfer switches and switchgear
Get a Sample Research PDF with TOC: http://www.researchmoz.us/enquiry.php?type=S&repid=685255
Technavio's report, Data Center Construction Market in South East Asia 2016-2020, has been prepared based on an in-depth market analysis with inputs from industry experts. The report covers the market landscape and its growth prospects over the coming years. The report also includes a discussion of the key vendors operating in this market.
Key vendors
- CSF Group
- M+W Group
- Nakano Construction
- Sara-Timur
- Wah Loon Engineering
Other prominent vendors
- Alphamatic Systems
- AWP Architects
- CPG Consultants
- DSCO Group
- Kienta Engineering Construction
- Kinetics Corporate
- Nova
- PWS (Malaysia)
- Sato Kogyo
Market driver
- Increased demand for cloud-based services and big data analytics
- For a full, detailed list, view our report
Enquiry at: http://www.researchmoz.us/enquiry.php?type=E&repid=685255
Key questions answered in this report
- What will the market size be in 2020 and what will the growth rate be?
- What are the key market trends?
- What is driving this market?
- What are the challenges to market growth?
- Who are the key vendors in this market space?
- What are the market opportunities and threats faced by the key vendors?
- What are the strengths and weaknesses of the key vendors?
About ResearchMoz
ResearchMoz is the world's fastest growing collection of market research reports worldwide. Our database is composed of current market studies from over 100 featured publishers worldwide. Our market research databases integrate statistics with analysis from global, regional, country and company perspectives. ResearchMoz's service portfolio also includes value-added services such as market research customization, competitive landscaping, and in-depth surveys, delivered by a team of experienced Research Coordinators.
Contact Us:
Mr. Nachiket
Albany NY - 12207
United States
Tel: +1-518-621-2074
Tel: 866-997-4948 (Us-Canada Toll Free)
Email: sales@researchmoz.us
Follow us on LinkedIn at: http://bit.ly/1TBmnVG
Data Center Construction (DCC) Market in Southeast Asia 2016-2020 - Enormous Growth in Data Volumes, Triggering an Increased Need for the Data Center Construction
ResearchMoz added Latest Research Report titled " Data Center Construction Market in Southeast Asia 2016-2020: Worldwide Market Size, Shares, Trends, Growth, Survey and Forecast report " to it's Large Report database.