Albany, NY -- (SBWire) -- 05/09/2017 --UPS systems facilitate the continuous functioning of devices such as computers, telecommunications equipment, and other electrical appliances for short periods when there is a loss of power from the primary power source. These systems can also protect the devices from power surges.
The global UPS battery market to grow at a CAGR of 8.18% during the period 2017-2021.
Covered in this report
The report covers the present scenario and the growth prospects of the global UPS battery market for 2017-2021. To calculate the market size, the report considers the new installations and exclude aftermarket services.
The market is divided into the following segments based on geography:
Americas
APAC
EMEA
Get The Sample Copy Of This Report : http://www.marketresearchreports.biz/sample/sample/1067125
Technavio's report, Global UPS Battery Market 2017-2021, has been prepared based on an in-depth market analysis with inputs from industry experts. The report covers the market landscape and its growth prospects over the coming years. The report also includes a discussion of the key vendors operating in this market.
Key vendors
Amara Raja Power Systems
East Penn Manufacturing
Eaton
EnerSys
Exide Technologies
Other prominent vendors
ALCAD
C&D TECHNOLOGIES
Coslight India Telecom
Duracell
Energizer
EverExceed
EXIDE INDUSTRIES
HBL Power Systems
Market driver
Increase in data center construction
For a full, detailed list, view our report
Market challenge
UPS battery failure
For a full, detailed list, view our report
View More Details: http://www.marketresearchreports.biz/analysis/1067125
Market trend
Use of Li-ion based UPS systems
For a full, detailed list, view our report
Key questions answered in this report
What will the market size be in 2021 and what will the growth rate be?
What are the key market trends?
What is driving this market?
What are the challenges to market growth?
Who are the key vendors in this market space?
What are the market opportunities and threats faced by the key vendors?
What are the strengths and weaknesses of the key vendors?
You can request one free hour of our analysts time when you purchase this market report. Details are provided within the report.
To order report Call Toll Free: 866-997-4948 or send an email on sales@marketresearchreports.biz
Global UPS Battery Market Size and Share Will Reach at CAGR of 8.18% over Period 2017-2021: Increase in Data Center Construction
Recent research report, industry analysis and forecast on "Global UPS Battery Market 2017-2021"