ReleaseWire

Recent Study: Data Center Construction Market in Southeast Asia 2016-2020

Fast Market Research announces the availability of the new TechNavio report, "Data Center Construction Market in Southeast Asia 2016-2020", on their comprehensive research portal

Posted: Friday, April 08, 2016 at 8:15 AM CDT

Boston, MA -- (SBWire) -- 04/08/2016 --The construction of a data center encompasses design, architecture, installation of electrical and mechanical systems, and general construction works.

The demand for cloud-based services and the growth of the Internet of Things (IoT) are prompting enterprises in Southeast Asia to construct data centers to gain a competitive edge. Complexities associated with business applications have increased because of enormous growth in data volumes, triggering an increased need for the construction and renovation of data centers. In addition, enterprises are focusing on the building of green data center facilities to reduce power consumption and carbon dioxide emissions.

Get More Details on this Report and a Full Table of Contents at Data Center Construction Market in Southeast Asia 2016-2020

Technavio's analysts forecast the data center construction market in Southeast Asia to grow at a CAGR of 14.8% during the period 2016-2020.

Covered in this report
The report covers the present scenario and the growth prospects of the data center construction market in Southeast Asia for 2015-2020. To calculate the market size, the report considers the revenue generated from the building of new data centers (including modular data center facilities) and the renovation of data centers.

The market is divided into the following segments based on electrical construction:

-UPS
-Energy storage equipment
-Generators
-Transfer switches and switchgear

Technavio's report, Data Center Construction Market in South East Asia 2016-2020, has been prepared based on an in-depth market analysis with inputs from industry experts. The report covers the market landscape and its growth prospects over the coming years. The report also includes a discussion of the key vendors operating in this market.

Key vendors

-CSF Group
-M+W Group
-Nakano Construction
-Sara-Timur
-Wah Loon Engineering

Other prominent vendors

-Alphamatic Systems
-AWP Architects
-CPG Consultants
-DSCO Group
-Kienta Engineering Construction
-Kinetics Corporate
-Nova
-PWS (Malaysia)
-Sato Kogyo

Market driver

-Increased demand for cloud-based services and big data analytics
-For a full, detailed list, view our report

Market challenge

-Poor analysis of business requirements
-For a full, detailed list, view our report

Market trend

-Green data centers
-For a full, detailed list, view our report

Key questions answered in this report

-What will the market size be in 2020 and what will the growth rate be?
-What are the key market trends?
-What is driving this market?
-What are the challenges to market growth?
-Who are the key vendors in this market space?
-What are the market opportunities and threats faced by the key vendors?
-What are the strengths and weaknesses of the key vendors?

You can request one free hour of our analyst's time when you purchase this market report. Details are provided within the report.

Companies Mentioned in this Report: CSF Group, M+W Group, Nakano Construction, Sara-Timur, Wah Loon Engineering, Alphamatic Systems, AWP Architects, CPG Consultants, DSCO Group, Kienta Engineering Construction, Kinetics Corporate, Nova, PWS (Malaysia), Sato Kogyo

About Fast Market Research
Fast Market Research is a leading distributor of market research and business information. Representing the world's top research publishers and analysts, we provide quick and easy access to the best competitive intelligence available. Our unbiased, expert staff is always available to help you find the right research to fit your requirements and your budget. For more information about these or related research reports, please visit our website at http://www.fastmr.com or call us at 1.800.844.8156.

Browse all Software research reports at Fast Market Research

You may also be interested in these related reports:
-Data Center Construction Market in Southeast Asia 2015-2019
-Data Center Rack Market in Southeast Asia 2015-2019
-Data Center Cooling Market in Southeast Asia 2015-2019
-Global Data Center Construction Market 2015-2019
-Data Center Construction Market in the US 2015-2019